Isocyanate paint spraying: Safely managing spray booths and rooms Back to Beta This is a new way of showing guidance - your feedback will help us improve it. Booths are manufactured and installed to contain all hazardous materials. [29 CFR 1910.107 (b) (1)] All spray booth floor and baffle plates (grates) should be constructed with noncombustible material. Spray Paint Booth Codes and Regulations There are several codes and regulatory standards that are used by various local governments for defining spray booth requirements. 3 Airline breathing apparatus is required for anyone present in the spray booth or room during spraying and during the clearance time. To view the various NFPA Codes and Standards use the following link. It will also be useful to industries other than motor vehicle repair where there is spraying of isocyanate-containing paints and lacquers. Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Spray booths should be constructed of steel, concrete, or masonry, and securely and rigidly supported. Spray paint booths are designed to keep the environment, your employees and your facilities safe. Any spray booth or associated equipment for which initiation of construction, installation, reconstruction, or alteration (as defined in rule 567—20.2(455B)) occurred after October 23, 2013, shall use sprayed material with a maximum lead content of 0.35 pounds or less per gallon if the booth or associated equipment is subject to the following NESHAP: 40 CFR Part 63, Subpart HHHHHH or Subpart XXXXXX. This guidance is aimed at vehicle bodyshop owners, managers and supervisors, their employees (particularly paint sprayers) and suppliers. Beta This is a new way of showing guidance - your feedback will help us improve it. Otherwise, you’re going to end up with patchy results and more than likely, dissatisfied customers. Controlling airborne contaminants at work, Local exhaust ventilation (LEV) workplace fume and dust extraction, Isocyanate paint spraying: Safely managing spray booths and rooms. The code that carries the most weight when it comes to spray booth construction and installation is NFPA-33 although parts of the others are also applicable in the areas they pertain to. This replaces the previous HSE publication Controlling isocyanate exposure in spray booths and spray rooms (WEB36). Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Every spray booth constructed in the U.S. that is used in a workplace environment is required to comply with OSHA regulations and standards, so it is important for spray booth owners and operators to understand that regulations Spray booths are used for carrying out paintwork on a wide range of vehicles and products. Spray Booth Requirements: 1. Any spray booth or associated equipment for which initiation of construction, installation, reconstruction, or alteration (as defined in rule 567—20.2(455B)) occurred after October 23, 2013, shall use sprayed material with a maximum lead content of 0.35 pounds or less per gallon if the booth or associated equipment is subject to the following NESHAP: 40 CFR Part 63, Subpart HHHHHH or Subpart XXXXXX. Spray booths shall be substantially constructed of steel not less than 0.044 inch (18 gauge) in thickness or other approved noncombustible material. From cars to aeroplanes, you need a clean enclosed space to carry out your work and stop dust from ruining your smooth paintwork. Booth should be designed to sweep air currents toward the exhaust outlet. (CFC Chapter 24) Spray booths shall be designed to sweep air … Spray Booth Construction Spray booths should be constructed with securely and rigidly supported steel, concrete or similar masonry. Interior surfaces should be smooth, continuous, and non-combustible. With a car, there is a lot of responsibility that falls on the driver. Each state, county and city usually selects one of these codes as the main top-level code to reference requirements. To view the various NFPA Codes and Standards use the following link. Each state, county and city usually selects one of these codes as the main top-level code to reference requirements. [29 CFR 1910.94 (c) (3) (iii)] Spray booths shall be designed to sweep air … The NFPA codes for spray booths go beyond the design, production and documentation that Standard Tools provides. There are requirements within the codes about the location of the spray booth, an adequate air supply and the use of licensed electricians. Spray Booth Design Requirements Tested By Qualified Engineers All our spray booth engineers are required to undertake on-going training and assessment to ensure they are fully conversant with new spray booth regulations (a) Spray booths and connected ductwork shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry, except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. The code that carries the most weight when it comes to spray booth construction and installation is NFPA-33 although parts of the others are also applicable in the areas they pertain to. Spray Paint Booth Codes and Regulations There are several codes and regulatory standards that are used by various local governments for defining spray booth requirements. Sprinklers, visible gauges, and alarms should be properly installed. That means it is up to you, as a finisher, to ensure your booth and your operations comply with all applicable federal, state and local regulations. HSE aims to reduce work-related death, injury and ill health.